Progress May 2018

Progress has been slow but steady. We have put up a shelter in part of the new area and have the structure for the toilet/washroom and isolation room almost complete. Walls, roof and floors done, windows and doors to be fitted. Washroom still to be plastered.
Have today (30 Apr 2018) purchased the materials for the kitchen roof – corrugated iron and steel pipes.

Shelter in back area.
Ramesh working on the floor of the toilet/washroom.

Roof iron for kitchen on site.